Pages

Showing posts with label Bridge Building. Show all posts
Showing posts with label Bridge Building. Show all posts

Friday, 7 September 2018

Bridge building


Today for Inquiry we have continued to make a bridge stronger and gluing each part together. Our group has finished creating our bridge. We manege to glue the trusses on the side of the deck. We collaborated and worked out how to make our bridge stronger. We have placed more sticks under the bridge and we have used 196 toothpicks and each toothpicks are worth 25 Cents. All together it was $54.45c. We had a few problems with our bridge the problem was some of the tooh picks were not touching. Me and San Kyaw worked collaboratively to finish this off

Wednesday, 5 September 2018

Bridge Building

This week for inquiry we are building bridges that should go to Rata point and Redcliff point. To build these bridges we used toothpicks and glue, this is a completion against the other groups so everyone is trying to make there bridge the best because there is going to be a prize. San kyaw and I have a few special jobs to do. This is only the side we still have to do the bridge deck and the other side. Me and San Kyaw my partner worked collaboratively to finish this off.