I am a Year 8 student at Panmure Bridge School in Auckland, NZ. I am in Learning Space 2 and my teachers are Ms Kirkpatrick and Mrs Anderson.
Tuesday, 25 September 2018
Panmure Bridge Labeling
Today for inquiry we made our own version of the Panmure bridge on a google drawing. We labeled all of the different parts of the bridge and that are used to build the bridge. There are 4 different parts to the bridge that is the bridge deck so people and cars can go across the iron swing opens so the boats can get to the other side, abutment is to hold the iron swing and the piles holds the bridge deck and prevents it from collapsing.
Labels:
2018,
Inquiry,
Joshua,
Panmure Bridge Labeling
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment